Pivnet T5/ERCOFTAC SIG 32

2nd Workshop on PIV

Rome September 3-4 1999

 

Final agenda

 

Friday the 3rd

9h00 Welcome and presentation of T5/SIG 32 M. Stanislas
9h15 Presentation of PIVNET activity in the last year J. Kompenhans
9h30 Invited lecture : PIV standart experiment in Japan Dr. Okamoto
10h00 Invited lecture : advanced research on lasers Thomson CSF
10h30 Coffee break
11h00 Session 1 : Assessment of PIV performances chairman, M. Riethmuller
New developments at PivNet database and  website J. Kompenhans&H. Richard
Improved precision and optimization of correlation Imaging Velocimetry algorithms Fincham&G. Delerce
Accuracy of video stereoscopic PIV W. Scheuerpflug
Accuracy of CCD sensors for PIV M. Stanislas
12h30 Lunch
14h30 Session 2 : Boundary layers and wakes chairman, M. Stanislas
PIV Study of Longitudinal Vortices in a Turbulent Boundary Layer Flow M. Onorato
Spatial and temporal velocity correlations in a low-Reynolds number turbulent boundary layer using DPIV J.M. Melo de Sousa
PIV measurements in the near wall region of turbulent boundary layers K. Angele
Control of the development of the wake behind cylindrical geometries L. David
16h00 Coffee break
16h30 Discussion : PIV hardware and software managers : J. Kompenhans&M. Riethmuller
17h30 End of day 1

 

Saturday the 4th

9h00 Session 3 : Application and extensions of PIV chairman J. Kompenhans
Application of PIV for In-cylinder Flow Analysis in Passenger Car Engines W. Hentschel
Accelerating the PIV 2D Correlation using a General Purpose DSP J. Raposo
Investigation of slug flow using PIV M. Riethmuller
Combined Application of PIV, LIF, Mie and Raman-Scattering for the Characterization of Sprays V. Beushausen
10h30 Coffee break
11h00 Session 4 : Application and extensions of PIV chairman, J. Kompenhans
Measuring velocities in wind tunnel flows with digital speckle pattern interferometry P. Arroyo&A. Nieves
Combined DPIV-PLIF Measurements of Turbulent Jet Flow J. Bolinder&A. Borg
PIV/LIF measurements J. Westerweel
12h10 Discussion : Extensions of PIV managers : J. Kompenhans&M. Riethmuller
13h10 End of meeting

 
fleche retour.gif (1291 octets)    Return to Sig page

Page WK2 updated on november 2000